EEI provided design and construction engineering services for the replacement of water main in the Village of Roselle. The project consisted of installing approximately 3,600 feet of 8-inch water main.
Highlights
$1,250,000
2022
Replacement of Approximately 3,600 Feet of 8-inch Water Main
PVC Water Main
A Portion of PVC Water Main was Directionally Drilled
Extensive Coordination with HOA for Rear Yard Installation