Lakewood Creek West Drainage Investigation
LAKEWOOD CREEK WEST DRAINAGE INVESTIGATION
Village of Montgomery, Illinois
EEI conducted a drainage investigation and hydrologic and hydraulic modeling for an existing subdivision experiencing flooding problems. The design for the subdivision had underestimated the amount of off-site tributary area coming to the development and as a result, the detention basins were filling and staying full causing ponding water and basement flooding in the area.
Highlights:
- Drainage Investigation
- Hydrologic and hydraulic modeling for existing subdivisions experiencing local flooding
- Creations of an EPASWMM model of the tributary watershed, the developments, and the series of detention basins and their interconnecting restrictor structures and storm sewers
- Alternatives included increased restrictor sizing, additional outfall storm sewers, bypass storm sewers, and increased storm sewer sizing between detention basins
- Cost estimates for alternatives and phasing plans
- Designed new bypass storm sewer for off-site flows

FLOODPLAIN AND STORMWATER MANAGEMENT
PROJECT EXPERIENCE
Why Our Clients Choose Us
Today, EEI has a staff of over 80 and has the privilege of serving our clients. Our philosophy of putting our clients first has led to many longstanding client relationships.
Outstanding Service. Every Client. Every Day.
Engineering Enterprises, Inc.’s philosophy of putting its clients first has led to many longstanding client relationships in northeastern Illinois and goes hand in hand with the EEI reputation of working diligently to enhance the quality of life and improve the health and welfare of the residents in the communities we serve.
STAY ALWAYS IN TOUCH
Subscribe to our newsletter to get it delivered straight to your inbox.







