NEW WELL NO. 13
NEW WELL NO. 13
City of Warrenville, Illinois
EEI provided design engineering services for a new Silurian-Dolomite well and adjacent water treatment plant with a design capacity of 700 GPM. The new 2,500 square-foot water treatment facility will feature an iron removal system with feeds for various chemicals including sodium hypochlorite, fluoride, and a corrosion inhibitor. Twelve private residential wells within a 1,600-foot radius of Well 13 were consensually analyzed before, during, and after the 29-hour pump test of the new municipal well, following drilling completion in the Fall of 2023. Construction of the Water Treatment Plant (WTP) is anticipated in 2025.
Highlights:
$353,714 (2023-2024)
Construction of WTP: 2025
- Silurian-Dolomite Shallow Bedrock Well with target capacity of 700 GPM
- Well Site Analysis
- Analysis of Well Aquifer Capacity and Pumping Hydraulics
- Detailed Hydrogeologic Analysis of Aquifer and Impacts to Surrounding Area
- Water Chemistry Analysis for Chemical Dosage and Iron Removal System Sizing
- Development of Project Manuals for Bidding
- IEPA Construction Permitting
- Bidding Coordination and Construction Oversight
- Engineering Support and Management for Electrical and Controls Design

WATER WORKS SYSTEMS
PROJECT EXPERIENCE
Why Our Clients Choose Us
Today, EEI has a staff of over 80 and has the privilege of serving our clients. Our philosophy of putting our clients first has led to many longstanding client relationships.
Outstanding Service. Every Client. Every Day.
Engineering Enterprises, Inc.’s philosophy of putting its clients first has led to many longstanding client relationships in northeastern Illinois and goes hand in hand with the EEI reputation of working diligently to enhance the quality of life and improve the health and welfare of the residents in the communities we serve.
STAY ALWAYS IN TOUCH
Subscribe to our newsletter to get it delivered straight to your inbox.