Chicago Street, Elgin

Chicago Street From Center Street to Liberty Street (STP)

City of Elgin, Illinois

Project consisted of approximately 3,500 feet of reconstruction. The existing two-lane road with parking on both sides was reconstructed to provide for two shared lanes for vehicular/cyclist traffic in each direction and parking. The improvements consisted of PCC pavement, concrete curb and gutter, PCC sidewalk, storm sewer, water main, sanitary sewer lining, ornamental roadway lighting, and traffic signal modifications.

Highlights

$8,020,700 Federal Funds

2012-2020

  • Phase I, II, and III Engineering Services
  • Project Development Report
  • Complete Roadway Reconstruction
  • Residential and Commercial Area Water Main Replacement
  • 6,300 Linear Feet of Storm Sewer up to 54-Inches
  • Sanitary Sewer Decombining
  • Sanitary Sewer Pipe and Manhole Lining
  • HydroCAD Model Created for Storm Sewer System
  • Ornamental Roadway Lighting