Devon Avenue and Busse Road Intersection Resurfacing, Elk Grove Village

Devon Avenue and Busse Road Intersection Resurfacing

Village of Elk Grove Village, Illinois

Project included the resurfacing of Devon Avenue from approximately 750 feet west of the intersection of Illinois Route 83 (Busse Road) to approximately 800 feet east of the intersection. The project also included spot sidewalk and curb and gutter removal and replacement, new sidewalk in the southeast quadrant of the intersection, ADA compliant ramps at all crossings, pedestrian push buttons with Accessible Pedestrian Signals (APS) at the intersection and removal of a Pace bus shelter.

Highlights

$1,257,700 (Federal Funds)
2021-2022

  • Federally Funded Resurfacing
  • Phase I, II, and III
  • Roadway Resurfacing
  • Sidewalk and Curb and Gutter Removal and Replacement
  • New Sidewalk Installation
  • ADA Curb Ramp Installation with Accessible Pedestrian Signal (APS) Improvements