East & West Wastewater Treatment Facility Improvements, Huntley

East & West Wastewater Treatment Facility Improvements

Village of Huntley, Illinois

Project included several crucial modifications to the Village’s  existing East and West Wastewater Treatment Plants.

Highlights

$3,100,000

2017-2023

  • New Chemical Feed Facility for Removal of Total Phosphorus at the West WWTP
  • Modifications to the Existing Oxidation Ditches to Promote Biological Phosphorus Removal
  • Replacement of the East WWTP Ultraviolet Disinfection System with More Efficient and Easier to Operate System
  • Coming Soon! New Sludge Storage Building to Increase Digested Biosolids Storage and Handling

Highlights Cont'd

$560,000

2022-2023

  • Design Engineering
    • Electrical Design
    • UV Equipment Review
    • Constructability Assessment
    • Hydraulics Evaluation
    • HVAC and Electrical Design
    • Systems Integration
  • Construction Engineering
    • Shop Drawing Review
    • Coordination with Contractor and Village
    • On-Site Inspection
WASTEWATER SYSTEMS

Project Experience