Wastewater Treatment Facility Improvements
City of Sandwich, Illinois
EEI provided design and construction engineering services for the wastewater treatment facility (WWTF) improvements, funded by a $13 million SRF low-interest loan. The project consisted of installing facilities at WWTF to achieve compliance with the 1.0 mg/L and future 0.5 mg/L phosphorus NPDES permit limit and various WWTF improvements that replaced aging equipment and reduce O&M costs.
Highlights
$12,965,000
2021-2024 (Construction On-Going)
- Planning, Design and Construction Engineering Services
- Preparation of Construction Drawings
- SRF Loan Administration
- Development of Project Manuals for Bidding
- IEPA Construction Permitting
- Advertisement and Bidding
- Bidding Coordination and Construction Oversight
Improvements Include:
- New Oxidation Ditch Aerators and VFD’s
- New Raw Sewage Pumps
- New Tertiary Cloth Disc Filter
- New Chemical Feed Storage and Feed Facility
- Addition of Two (2) New Aerobic Digesters
- Renovations of Three (3) Existing Aerobic Digesters with New Diffusers and Blowers, and Covers
- Significant Electrical Upgrades
- Full WWTF Capacity Stand-By Electrical Generator
- Upgraded SCADA System