Lakeside Subdivision Water Main Improvements
Village of Wheeling, Illinois
EEI provided design and construction engineering services for the replacement of water main in the Village of Wheeling. The project consisted of installing approximately 7,700 feet of 8-inch and 10-inch water main.
Highlights
$3,772,000
2023-2024
- Design and construction engineering services
- Locally funded
- 5,200 feet of 8-inch PVC and 2,500 feet of 10-inch PVC
- Directionally drilled 900 feet of PVC
- 243 water services
- HMA patching and various PCC repairs
- Extensive rear-yard and side-yard water main servicing numerous multi-family units
- Permitting with IEPA and Cook County

WATER WORKS SYSTEMS
Project Experience
Previous
Next