New Well No. 13
City of Warrenville, Illinois
EEI provided design engineering services for a new Silurian-Dolomite well and adjacent water treatment plant with a design capacity of 700 GPM. The new 2,500 square-foot water treatment facility will feature an iron removal system with feeds for various chemicals including sodium hypochlorite, fluoride, and a corrosion inhibitor. Twelve private residential wells within a 1,600-foot radius of Well 13 were consensually analyzed before, during, and after the 29-hour pump test of the new municipal well, following drilling completion in the Fall of 2023. Construction of the Water Treatment Plant (WTP) is anticipated in 2025.
Highlights
$353,714
2023-2024
Construction of WTP: 2025
- Silurian-Dolomite Shallow Bedrock Well with target capacity of 700 GPM
- Well Site Analysis
- Analysis of Well Aquifer Capacity and Pumping Hydraulics
- Detailed Hydrogeologic Analysis of Aquifer and Impacts to Surrounding Area
- Water Chemistry Analysis for Chemical Dosage and Iron Removal System Sizing
- Development of Project Manuals for Bidding
- IEPA Construction Permitting
- Bidding Coordination and Construction Oversight
- Engineering Support and Management for Electrical and Controls Design