New Well No. 13, Warrenville

New Well No. 13

City of Warrenville, Illinois

EEI provided design engineering services for a new Silurian-Dolomite well and adjacent water treatment plant with a design capacity of 700 GPM. The new 2,500 square-foot water treatment facility will feature an iron removal system with feeds for various chemicals including sodium hypochlorite, fluoride, and a corrosion inhibitor. Twelve private residential wells within a 1,600-foot radius of Well 13 were consensually analyzed before, during, and after the 29-hour pump test of the new municipal well, following drilling completion in the Fall of 2023. Construction of the Water Treatment Plant (WTP) is anticipated in 2025.

Highlights

 $353,714

2023-2024

Construction of WTP: 2025

  • Silurian-Dolomite Shallow Bedrock Well with target capacity of 700 GPM
  • Well Site Analysis 
  • Analysis of Well Aquifer Capacity and Pumping Hydraulics
  • Detailed Hydrogeologic Analysis of Aquifer and Impacts to Surrounding Area
  • Water Chemistry Analysis for Chemical Dosage and Iron Removal System Sizing
  • Development of Project Manuals for Bidding
  • IEPA Construction Permitting 
  • Bidding Coordination and Construction Oversight
  • Engineering Support and Management for Electrical and Controls Design