Water Treatment Plant Rehabilitation - Coatings
City of Aurora, Illinois
EEI provided design and construction engineering services for the rehabilitation of the interior of one (1) clarifier, one (1) re-carbonation tank, one (1) vertical pipe gallery, and miscellaneous exterior piping. The project consisted of full abrasive blast cleaning the interiors of the three (3) vessels with containment and applying a two-coat epoxy liner coating system. The plant piping was power-washed and re-coated.
Highlights
$377,000
2022-2023
- Design and construction engineering services
- Rehabilitation of the interior of one (1) clarifier
- Rehabilitation of one (1) re-carbonation tank
- Rehabilitation of one (1) vertical pipe gallery
- Rehabilitation of miscellaneous exterior pipping
- Full abrasive blast cleaning of three (3) vessels with containment and application of a two-coat epoxy liner coating system
- Plant piping power washed and re-coated