Water Main Replacement, Yorkville

Water Main Replacement

United City of Yorkville, Illinois

Project consisted of the design and construction of approximately 8,780 feet of water main and all valves, hydrants, water services, and related appurtenances required to replace the existing water main. It also included removing and replacing asphalt and concrete driveways and sidewalks and replacing any other items likely to be disturbed from the water main installation.

Highlights

$3,618,000 (Contracts A & B)

2022-2023

  • 1,480 Feet of 12-Inch DIP
  • 4,965 Feet of 8-Inch DIP
  • 120 Services
  • 355 Feet of 12-Inch RCP Storm Sewer
  • Removal and Replacement of Asphalt and Concrete Driveways and Sidewalks
  • Residential Neighborhood Coordination and Outreach
Construction Services

Project Experience